20 12 A72 |
CESA COURTNEY MARIE & |
34 |
BRIDLE DR |
Draft
|
Building |
|
369.10 |
New |
Deck renovation. Remove portions of the existing deck per the plan submitted and dispose of. Install one new deck section 10’x11’ and new stairs with landing. Install all new Trex decking and railings. |
50 28 23 10 |
MORRELL WANDA M & FRANK L |
30 |
MINER LANE |
Draft
|
Building |
|
369.10 |
Payment Rcvd |
Full Roof Replacement - House. Remove existing roof shingles and replace with 43 SQ new architectural asphalt shingles following code and manufacturers recommendations. Install ice & water shield as required by code and apply 4” polymer membrane tape on deck seams as necessary.
|
20 12 A42 |
LARRYS CONSTRUCTION COMPANY INC |
47 |
BRIDLE DR |
Draft
|
Fuel Gas |
|
30.52 |
New |
place (2) 120g lp tank to stub |
40 16 15 B |
HOSKINS GREENWAY LLC |
127 |
NEW HARTFORD RD |
Draft
|
Electrical |
|
112.60 |
Payment Due |
Install new 400 amp overhead service with 3 tenant meters. Wire 3 rental bays for basic lights and outlets |
1 1 7-2 10 |
TOWERS ADAM LAWRENCE & |
97 |
TAYLOR RD |
Draft
|
Electrical |
|
30.52 |
Attachments Rcvd |
Move receptacle for new added closet |
44 39 7 58 |
MULLADY MARIA V & EDWARD R EST OF |
22 |
ROBIN DR |
25-77B
|
Building |
06/17/2025 |
51.04 |
Approved |
install metal pre fab railings |
20 12 A42 |
LARRYS CONSTRUCTION COMPANY INC |
47 |
BRIDLE DR |
25-41E
|
Electrical |
06/17/2025 |
0.00 |
Approved |
Wire new house with 200 amp service |
1 1 7-2 10 |
TOWERS ADAM LAWRENCE & |
97 |
TAYLOR RD |
Draft
|
Building |
|
30.52 |
Under Review |
adding a closet to office |
1 2 18 |
RIVERTON CONGREGATIONAL CHURCH |
11 |
ROBERTSVILLE RD |
Draft
|
Building |
|
40.78 |
Under Review |
Installation of 1.5 inch insulation and sheet rock over in attic |
11 8 4 |
MACIAS SAMANTHA JOAN & EDUARDO GREGORIO |
78 |
RIVERTON RD |
Draft
|
Electrical |
|
287.02 |
Under Review |
Install roof mounted solar PV system, 26 panels (10.660 kW DC). Structural upgrades required. |
11 8 4 |
MACIAS SAMANTHA JOAN & EDUARDO GREGORIO |
78 |
RIVERTON RD |
Draft
|
Building |
|
133.12 |
Under Review |
Install roof mounted solar PV system, 26 panels (10.660 kW DC). Strong back structural upgrades required. |
11 8 3 3-6 |
MALEY ROBERT J & JUDITH M |
18 |
OLD COACH RD |
25-40E
|
Electrical |
06/12/2025 |
40.78 |
Approved |
Replace 200 amp meter socket underground |
20 12 A42 |
LARRYS CONSTRUCTION COMPANY INC |
47 |
BRIDLE DR |
Draft
|
Mechanical |
|
256.24 |
Attachments Rcvd |
INSTALL HEATING AND AIR CONDITIONING SYSTEM COMPLETE WITH DUCT WORK |
13 21 2 3 |
CONNORS EDWARD A |
191 |
PARK RD |
25-76B
|
Building |
06/12/2025 |
112.60 |
Approved |
Tear off existing shingles, Synthetic Paper, Seam Taping, Ice and water barrier, 16 SQ GAF HDZ Lifetime ARC. Shingle installed. Install new metal edging, ridge vent and boots. |
44 38 14 |
FEINMAN JASON DANIEL SAUNDERS |
18 |
RATLUM MTN RD |
25-75B
|
Building |
06/12/2025 |
430.66 |
Approved |
Tear off existing shingles, Synthetic Paper, Seam Taping, Ice and water barrier, 48 SQ GAF HDZ Lifetime ARC. Shingle installed. Install new metal edging, ridge vent and boots. House and Garage. |
20 12 A42 |
LARRYS CONSTRUCTION COMPANY INC |
47 |
BRIDLE DR |
25-12P
|
Plumbing |
06/12/2025 |
174.16 |
Approved |
Plumbing for brand new house, new drainage, waste vent piping, water, piping, radon, piping, gas piping. |
40 17 22 |
STETSON DAVID |
19 |
RIPLEY HILL RD |
Draft
|
Building |
|
30.52 |
Under Review |
Install a New 8' x 10 ' outside storage shed. |
1 1 7-2 10 |
TOWERS ADAM LAWRENCE & |
97 |
TAYLOR RD |
25-15M
|
Mechanical |
06/12/2025 |
81.82 |
Approved |
Installation of (1) LG RED 18K Outdoor low ambient condenser + installation of (1) 18K wall head. Scope of work includes installation of new lineset piping and hide-a-pipe from outdoor to indoor unit. |
30 13 36 E |
SHOPEY TAYLOR ANNE-MARIE & ROBERT III |
10 |
DEW RD |
Draft
|
Building |
|
133.12 |
Under Review |
Installation of LP fireplace insert (master bedroom) and freestanding wood stove (living room) |
31 13 19 |
CHUANG PETER Y TR & |
1 |
WEST RIVER RD |
25-14M
|
Mechanical |
06/12/2025 |
61.30 |
Approved |
Install condensing unit and coil, Tie in line set and electrical, Start-up and test |
41 28 16 |
HEATH RAYMOND G & |
27 |
GOOSE GREEN RD |
25-74B
|
Building |
06/12/2025 |
81.82 |
Approved |
Replace old roof with new roof, inspect plywood and replaced plywood if needed tape all plywood seems ice and water, roofing laminate, new rake and drip edge six nails per shingle |
39 16 11 |
DUNLOP LYNDA R & |
132 |
EDDY RD |
25-72B
|
Building |
06/05/2025 |
204.94 |
Attachments Rcvd |
Full Roof Replacement - House. Remove existing roof shingles and replace with 20 SQ new architectural asphalt shingles following code and manufacturers recommendations. Install ice & water shield as required by code and apply 4” polymer membrane tape on deck seams as necessary.
|
|