015 033 000~1527 |
LEMIEUX-SGARIGLIA MICHAEL |
116 |
WILKINSON ST |
Draft
|
Electrical |
|
113.34 |
New |
Required to relocate the MSP does not have 3ft clearance in front and install a MM because the MSP is now going to be further than 6 ft away from entering the house. MSP adder may increase pending new location. |
015 033 000~1527 |
LEMIEUX-SGARIGLIA MICHAEL |
116 |
WILKINSON ST |
Draft
|
Building |
|
135.86 |
New |
Installation of a safe and code-compliant grid-tied solar system on an existing residential roof. 9 Panels / 3.9kW
|
003 030 000~75 |
PROVOST DENIS A & JEANNE M |
508 |
CHURCH ST |
Draft
|
Building |
|
124.60 |
Hold |
Roof replacement - remove existing layers, inspect decking & replace if needed, install proper underlayment, install new shingles
|
007 243 000~754 |
INIZIO INVESTMENTS LLC |
75-77 |
VAN DEN NOORT ST |
Draft
|
Building |
|
37.78 |
New |
Remove the existing deck at 77 Van Den Noort Street, Putnam, CT 06260, and construct a new deck with proper footings and bracing in accordance with current building codes. |
044 013 000~3371 |
CARR JENNIFER L |
215 |
RIVER RD |
Draft
|
Electrical |
|
37.26 |
New |
Installing production meter |
008 124 000~100307 |
WHEELER GARY A & KELLY M |
46 |
MECHANICS ST |
Draft
|
Electrical |
|
37.26 |
New |
Installing production meter |
016 043 000~1390 |
FRENIER KERRY ANN |
93-105 |
FARROWS ST |
Draft
|
Building |
|
135.86 |
New |
Full Roof Replacement - Rental Property. Remove existing roof shingles and replace with 12 SQ new architectural asphalt shingles following code and manufacturers recommendations. Install ice & water shield as required by code and apply 4” polymer membrane tape on deck seams as necessary.
|
020 086 000~2156 |
KEMPAIN R STEPHEN & PAMELA E |
199 |
SO MAIN ST |
Draft
|
Building |
|
349.80 |
Paid |
Full Roof Replacement - House. Remove existing roof shingles and replace with 27 SQ new architectural asphalt shingles following code and manufacturers recommendations. Install ice & water shield as required by code and apply 4” polymer membrane tape on deck seams as necessary.
|
007 101 000~622 |
PLACE ROSEMARY A & ROBERT C |
41 |
CLEVELAND ST |
Draft
|
Plumbing |
|
37.52 |
Paid |
water heater replacement - 40 gallon gas short 6 year |
027 002 000~2384 |
GIONIS GEORGE P |
252 |
PROVIDENCE PIKE |
Draft
|
Building |
|
237.20 |
Paid |
replace siding and front door 2 new replacement windows also in front |
039 074 000~3243 |
ASPINOCK HISTORICAL SOCIETY OF |
115 |
LIBERTY HGWY |
Draft
|
Building |
|
282.24 |
Paid |
Repair plaster, trim and finish all molding on first floors, install flooring from old lumber on site. |
046 033 000~3268 |
LAFLAMME PAUL L & NANCY E |
11 |
LIBERTY HGWY |
Draft
|
Mechanical |
|
68.30 |
New |
REPLACE: Existing 275 gal oil tank W/ OT265 Grandby Double Wall Oil Tank |
014 007 000~1723 |
HUTH MICHAEL & SANDRA |
117 |
UNDERWOOD RD |
Draft
|
Building |
|
113.34 |
Paid |
Remove existing asphalt shingles down to roof deck, resecured roof deck. Installed 6 ft of ice and water barrier on all leading edges and penetrations. Remainder of roof deck received synthetic underlay. New dripped edge and start around perimeters and reshingled using Owen’s Corning onyx black asphalt shingles. |
021 023 L00~185010 |
SBA TOWER INC |
154 |
SAYLES AVE |
Draft
|
Building |
|
406.10 |
Paid |
replacing 3 antennas and ancillary equipment on existing cell tower |
010 039 035~185862 |
FAGAN MATTHEW A JR & JOANNE MARIE |
297 #35 |
SABIN ST |
Draft
|
Building |
|
372.32 |
Paid |
Add two walls to existing basement, add vanity and bathroom. Subcontractors will pull their own. |
007 176 000~726 |
611 RIVERSIDE DRIVE LLC |
68-70 |
SMITH ST |
Draft
|
Building |
|
2320.30 |
Paid |
New Roof, adding additional one (1) bedroom to all 3 units, 3 bathroom remodels, 3 kitchen remodels, front porch remodel, landscaping/driveway being redone, enclosing 2nd story porch to be as livable space under air, new flooring/refinish floor, new siding, concrete slab in basement and insulating the building. |
026 072 000~2519 |
PUTNAM ACQUISITION LIMITED PARTNERSHIP |
625 |
SCHOOL ST |
Draft
|
Building |
|
37.52 |
Under Review |
TEMPORARY TENT FOR SALES OF CT LEGAL FIREWORKS FOR A TWO WEEK PERIOD |
012 046 000~952 |
MAYO HOLLY B & TROY M |
11 |
ROWE ST |
Draft
|
Building |
|
462.40 |
New |
30x50 4 Stall Garage |
019 005 000~2018 |
PALL CORPORATION |
125 |
KENNEDY DR |
25-7CO
|
CO |
05/01/2025 |
0.00 |
Approved |
Commercial Construction |
026 007 003~185996 |
VAJRA LLC |
50 #2 |
PROVIDENCE PIKE |
Draft
|
Building |
|
37.26 |
Under Review |
adding picnic tables to the front walk area |
012 125 000~2807 |
FRECHETTE HELEN D |
25 |
DAVIS ST |
25-14P
|
Plumbing |
05/05/2025 |
37.26 |
Approved |
REPAIR SEWER LINE IN BACK YARD |
019 025 000~2149 |
RODRIGUES ALINE |
167-171 |
SO MAIN ST |
Draft
|
Building |
|
37.26 |
Under Review |
Unit # 171 of the two family home. A few electrical outlet covers. Bracket on railing, possible removal of two doors if directed. Installation of a concrete pad in the basement for the placement of a washer and dryer with the associated hookups (plumbing & electric) Removal of non working electrical wires as directed. Replacement of the rotten boards on the front porch and footings if applicable. Porch will remain the same size. |
|